Installation of gantry crane
Installation of the gantry crane by using mobile crane AC 500.
Aug 25, 2019 2:43 PM MoreDemolition of the cultural center Svornost in Pilsen
Demolition of the cultural center Svornost took place in residential area in difficult conditions.
Jul 27, 2019 1:42 PM MoreCerhovice
Earthworks, complete earthworks for new hall in Cerhovice including construction of retention pond and new roundabout with connection to local infrastructure.
Jun 18, 2019 12:16 PM MoreDemolition of Strojírny Cheb area
Demolition of buildings in the former premises of Strojírny Cheb, incl. earthworks and construction of monolithic retaining walls.
May 27, 2019 1:42 PM MoreTransport of beer tanks
Transport of 10 beer tanks from Bürgstadt, Germany to Pilsen brewery. Beer tank with a diameter of 6.5 m and a length of 23 m, weight 28.7 t.
Apr 27, 2019 1:42 PM MoreDemolition of reinforced concrete hayloft after a fire
Demolition of reinforced concrete hayloft after a fire in AGRO Staňkov.
Mar 12, 2019 1:42 PM MoreTransmitter pole mounting
By using mobile crane AC 100 we carried out transmitter pole mounting including mounting of technology.
Feb 21, 2019 2:43 PM MoreTransportation and installation of technology
Transportation of technology to the Technical Inspection Station and consequential installation by using mobile crane AC 50
Jan 15, 2019 2:43 PM MoreNew hall at Bor u Tachova
Complete realisation of groundworks for extention of B6 hall and realisation of paved areas for cars and trucks including utilities in logistic park CTP Bor u Tachova.