Installation of gantry crane

Installation of the gantry crane by using mobile crane AC 500.

Aug 25, 2019 2:43 PM More

Demolition of the cultural center Svornost in Pilsen

Demolition of the cultural center Svornost took place in residential area in difficult conditions.

Jul 27, 2019 1:42 PM More

Cerhovice

Earthworks, complete earthworks for new hall in Cerhovice including construction of retention pond and new roundabout with connection to local infrastructure.

Jun 18, 2019 12:16 PM More

Demolition of Strojírny Cheb area

Demolition of buildings in the former premises of Strojírny Cheb, incl. earthworks and construction of monolithic retaining walls.

May 27, 2019 1:42 PM More

Transport of beer tanks

Transport of 10 beer tanks from Bürgstadt, Germany to Pilsen brewery. Beer tank with a diameter of 6.5 m and a length of 23 m, weight 28.7 t.

Apr 27, 2019 1:42 PM More

Demolition of reinforced concrete hayloft after a fire

Demolition of reinforced concrete hayloft after a fire in AGRO Staňkov.

Mar 12, 2019 1:42 PM More

Transmitter pole mounting

By using mobile crane AC 100 we carried out transmitter pole mounting including mounting of technology.

Feb 21, 2019 2:43 PM More

Transportation and installation of technology

Transportation of technology to the Technical Inspection Station and consequential installation by using mobile crane AC 50

Jan 15, 2019 2:43 PM More

New hall at Bor u Tachova

Complete realisation of groundworks for extention of B6 hall and realisation of paved areas for cars and trucks including utilities in logistic park CTP Bor u Tachova.

Dec 18, 2018 2:26 PM More

Christmas tree for Pilsen

53 year old Douglas fir weighing 3.5 tons

Nov 14, 2018 2:00 PM More