References (Page 46)

References (Page 46)
References

2006 Installation of walkway Božkov
We installed walkway with help of crane AC 350.

2006 Assembly of column Holýšov
Assembly of column we performed by use of telescopic crane AC 160.

2006 Tower crane Kavčí hory
By crane AC 200 we performed assembly of tower crane at Kavčí Hory.

2006 Railway transformer station Řehlovice
Relocation of transformer station was done by two telescopic cranes AC 100.

2006 Assembly of bridge TC 2800
We implemented a complete crane work together with transportation of concreate girders.

2006 Assembly of concrete girders Chotoviny
Assembly of concrete bridge girders we performed with use of telescopic crane AC 350.

2006 Lining up chimney at Lovosice
Telescopic crane AC 350 was used to lining up chimney at power plant Lovosice.

2006 Installation of walkway at Barandov
Installation of walkway we implemented with use of telescopic crane AC 100 and AC 350.

2006 Assembly of steel bridge Hostinné TC 2800-1
To assembler steel bridge we used trus crane TC 2800 - 1 and telescopic crane AC 200 and AC 350.

2006 Wind turbine Žipotín
With help of our special trailers we transported components of wind turbine. To assemble it we used our telescopic cranes AC 100 and AC 350.