Articles in category "Articles" (Page 8)
Articles in category "Articles" (Page 8)
Dismantling of bridge beams on the highway D1 at Rudná u Prahy
With help of AC 500 telescopis crane we dismantled bridge beams on the highway D1 at Rudná u Prahy and afterwards loaded by crane on the trailer and transported to a designated place.
Apr 3, 2017 2:29 PM MoreTransport of a tank from machine-works from Pacov to the Bernard brewery in Humpolec.
Transport of a tank from machine-works from Pacov to the Bernard brewery in Humpolec.
Mar 23, 2017 2:26 PM MoreTransportation of steel tank from Benešov to Dobříč.
Transportation of steel tank from Benešov to Dobříč.
Jan 17, 2017 2:26 PM MoreNew production and storage hall Ostrov u Stříbra
Complete earthworks for construction of new production and storage hall in logistic park Ostrov u Stříbra.
Jan 17, 2017 2:26 PM MoreTower blocks demolition Chanov
We made complete demolition works of 2 tower blocks including material recycling.
Nov 25, 2016 8:41 AM MorePlacement of conveyor at Lovosice
Placement of conveyor weighing 60 tons by cranes AC 500 and AC 350 at Lovosice.
Nov 16, 2016 2:16 PM MoreAdministrative building Dynamica Prague
Excavation of building pit, subconcrete concreting for new administrative building Dynamica Prague.
Oct 27, 2016 11:32 AM MoreReconstruction of the National Museum Building
Earthworks in the reconstruction of the historical building of the National Museum in Prague.
Aug 31, 2016 7:27 AM MoreTunneling shield Victoria Pilsen
Tunneling shield Victoria finished the first phase of tunnel excavation in the section Dýšiná - Pilsen.
Jul 18, 2016 10:19 AM More