References (Page 18)
References (Page 18)
References
2015 Installation of bridge deck at Karlovy Vary, Dalovice
We did installation of bridge dec kat Karlovy Vary, Dalovice with use of crane AC 350.
2015 Loading bridge superstructure on train
By use of crane AC 100 and AC 80 we moved bridge superstructure on the train.
2015 Installation of steel bridge during reconstruction of railway line Pilsen – Plasy
We did installation of steel bridge with use of crane AC 200 during reconstruction of railway line Pilsen – Plasy.
2015 Installation of railway sections during reconstruction of railway line Pilsen – Plasy.
We performed assembly of railway sections with use of crane AC 200 during reconstruction of railway line Pilsen – Plasy.
2015 Disassembly of steel silos at Domažlice
We implemented disassembly of steel silos at Domažlice by use of crane DEMAG AC 100 and DEMAG AC 35.
2015 Installation of concrete beam at Bezděkov
Transport and following installation of concrete beams was done by crane AC 100 during bridge repair at Bezděkov.
2015 Assembly of tower crane at Prague´s Pankrác
We made an assembly of tower crane by use of crane AC 350 at Prague´s Pankrác.
2015 Christmas tree at Pilsen 2015
We loaded up the Christmas tree at Pilsen, Koterovska street by use of crane AC 50 and transported it by use of frame truck to Pilsen main square. Where was placed by crane AC 30.
2015 Residence Palmovka
We provide an excavation of the pit include bottom surface for building of new residence Palmovka.