References in category"Reference" (Page 34)
References in category"Reference" (Page 34)
References
2010 Removal of Gothic bell by crane
Removal of Gothic bell. Using a crane, we removed the Maria Hilf Gothic bell dating back to 1419.
2010 Transport of technologies in Kralupy nad Vltavou
Transport of technologies in Kralupy nad Vltavou. Using a flatbed semi-trailer, we transported the oversized cargo in Kralupy nad Vltavou.
2010 Bridge transport
Transport of oversized cargo on the route Čepí –Karlovy Vary. Using a semi-trailer and crane, we transported the bridge to the historic centre of Karlovy Vary
2010 Transport of nuclear power station parts
Transport of nuclear power station parts on the route Pilsen – Lovosice – Olkiluoto. Using a deep semi-trailer, we transported nuclear power station parts from Škoda JS.
2010 Transport of mill parts
Carriage of mill parts, Uničov – Mělník. Using a special semi-trailer, we transported mill parts from Uničov to Mělník. Length of oversized cargo 18 m, diameter 4.6 m.
2010 Transport of catalysers
Transport of catalysers, Benešov - Stráž pod Ralskem. Using a frame semi-trailer, we transported catalysers from Benešov to Stráž pod Ralskem. Length of oversized cargo 11 m, diameter 5.4 m
2010 Transport of footbridge steel section
Transport of footbridge steel section to Pilsen. Using a special semi-trailer, we transferred the bridge structure from Prague to Pilsen. Width of oversized cargo 5.2m, length 42m.
2010 Transport of bridge structure
Transport of bridge structure. Using a special semi-trailer, we transported the bridge structure from Brno to Planá u Mariánských Lázní. Oversized cargo height 4.5m, length 44m.
2010 Transport of vessel for coal-fired power station
Transport of oversized cargo for a coal-fired power station. Using a deep semi-trailer, we transferred a vessel of diameter 7.52 m and height 4.35 m on the route Benešov – Mělník.
2010 Demolition of Karlovy Vary hospital
We undertook the demolition of the old hospital buildings in Karlovy Vary.