References (Page 54)
References (Page 54)
References
2005 Land coffer dam in Praha, street Antala Staska
We realized a excavating of a sheeted foundation pit in Praha, street A.Staska.
2005 Industrial zone Rudna u Prahy
We realized a complete levelling for construction of new hall no. 9 in industrial zone in Rudna.
2005 Tesco Postrizin
There were realized a complete levelling for new Tesco hall in Postrizin.
2005 Trumpf hall in Liberec
It required a complete levelling to build a new Trumpf hall in Liberec.
2005 Bridge no. 056 demoliton on highway D1
Complete demolition of the bridge were executed include material disposal on highway D1.
2005 Makro Liberec
We realized a complete levelling for new Makro building in Liberec.
2005 Foundation of the bridge on highway D3
An earthworks were executed during foundation works on bridges SO 201 and 202 on highway D3.
2005 Redevelopment in former CKD area
Demolition works and earthworks were realized during redevelopment works in former CKD area.
2005 Benatky n. Jizerou - dumping ground construction
Complete construction of a new dumping ground box were realized in Benatky nad Jizerou.
2005 Transport of excavated soil in Zisov
Transport of excavated soil from pond in Zisov.