References(Page 59)
References(Page 59)
References
2004 Airport demolition in Zatec
Complete demolition of all buildings of former airport in Zatec include the rundy, include material recycling and disposal.
2004 Demoliton and earthworks for OC Karlovy Vary
Demolition and earthworks for trade centre in Karlovy Vary.
2004 Earthworks and soil stabilization for Grupo
We realize an earthworks and soil stabilization form Grupo hall in Trutnov.
2004 Earthworks in Vsechromy
It required a levelling and earthworks for construction in Mountfield area in Vsechromy.
2004 CTP Divisov
The construction in industrial zone in Divisov required an execution of complete levelling and earthworks in soil no. 5 -7.
2003 Demolition of bridge at Lahovice
With telescopic cranes AC 350 and AC 200 we implemented bridge demolition at Lahovice.
2003 Christmas tree at Prague
We implemented complete crane work together with transport of Christmas tree to the Old Town Square Prague.
2003 Transport of steel beam
Steel beam was transported with use of flatbed trailer, cargo had dimentions 35 x 1 x 1,5 m.
2003 Transport of Christmas tree Prague 2003
Transport of Christmas tree to the Old Town Square Prague. With use of drop deck trailer we implemented transport of Christmas tree with lenght of 20 m from Velké Karlovice.
2003 Transport of Christmas tree Pilsen 2003
Transport of Christmast tree to the Pilsen Main Square was prepared by use of drop deck trailer and was placed by crane APB-Plzeň.