References (Page 59)

References (Page 59)

References

2004 Earthworks and soil stabilization for Grupo

We realize an earthworks and soil stabilization form Grupo hall in Trutnov.

More information

2004 Earthworks in Vsechromy

It required a levelling and earthworks for construction in Mountfield area in Vsechromy.

More information

2004 CTP Divisov

The construction in industrial zone in Divisov required an execution of complete levelling and earthworks in soil no. 5 -7.

More information

2003 Demolition of bridge at Lahovice

With telescopic cranes AC 350 and AC 200 we implemented bridge demolition at Lahovice.

More information

2003 Christmas tree at Prague

We implemented complete crane work together with transport of Christmas tree to the Old Town Square Prague.

More information

2003 Transport of steel beam

Steel beam was transported with use of flatbed trailer, cargo had dimentions 35 x 1 x 1,5 m.

More information

2003 Transport of Christmas tree Prague 2003

Transport of Christmas tree to the Old Town Square Prague. With use of drop deck trailer we implemented transport of Christmas tree with lenght of 20 m from Velké Karlovice.

More information

2003 Transport of Christmas tree Pilsen 2003

Transport of Christmast tree to the Pilsen Main Square was prepared by use of  drop deck trailer and was placed by crane APB-Plzeň.

More information

2003 Transport of mining machine

Transport of mining machina was realized with use of lowboy trailer and flatbad trailer.

More information

2003 Transport of loader

Transport of wheel loader was carried by lowboy trailer on the road Pilsen – Sokolov.

More information