Transport of wind turbines
Transport of wind turbines
Transport and construction of wind turbines. Using our technology, we prepared and erected wind turbines in Horní Částkov.
Oversized cargo dimensions: length of wind turbine blades 44.0m
Route: Bremerhaven (D) – Horní Částkov
Notes: complete preparation and construction of wind turbines using APB Pilsen technologies
We carry many types of heavy and oversized cargo. Interested in oversized cargo carriage?
Take a look at photos of the carriage of the oversized cargo:
Transport of wind turbines - video
Realisation date: 2009