References (Page 10)

References (Page 10)

References

2018 Transportation of steel beams to the Pilsen Main Railway Station

Transportation of steel beams to the Pilsen Main Railway Station and their consequential installation by using mobile crane AC 350.

More information

2018 Loading and transportation of the machine from Holoubkov

By  mobile cranes  AC 200 and AC 100 we loaded the machine on a low  loader.

More information

2018 Installation of beer tanks in Budweiser Budvar

With the AC 350 mobile crane we installed 34 pieces of beer tanks in Budweiser Budvar. ... More information

2018 Technology dismantling in mine Bílina

 By using mobile cranes AC 200 and AC 160 we dismantled technology in mine Bílina.

More information

2018 Installation of technology in Klatovy

Installation of technology by using AC 200 and AC 35 mobile cranes.

More information

2018 Turbine transportation and unloading

Turbine  unloading by using mobile crane AC 500.

More information

2018 Dismantling of railway foot over bridge in Cheb

By using mobile crane AC500 we carried out dismantling of railway foot over bridge in Cheb.

More information

2018 VTE gearbox replacement

By using mobile crane AC 500 we carried out VTE gearbox replacement. ... More information

2018 2nd phase of D1 motorway modernization

Within the 2nd phase of  D1 motorway modernization and extension  we provide earthworks, soil stabilization, including the laying down of drainages, gutters, sewerage and preparation of the gravel layer.

More information