References (Page 20)

References (Page 20)

References

2015 Disassemly and following assembly of railway bridge at Holubov

With use of crane Demag TC 2800 we disassembled old railway bridge weighing 93 tuns.

More information

2015 Installation of concrete bridge crossing

Transport of concrete bridge sections including installation by crane AC 100 at Líně.

More information

2015 Advertising banner for McDonald´s Pilsen

By use of crane AC 100 was exchanged new advertising banner for McDonald´s Pilsen – Roudná.

More information

2015 Zbořený Kostelec pedestrian bridge

We implemented assembly of pedestrian bridge by crane AC 200.

More information

2015 Earthworks on Hornbach Prague - Chuchle

We execute an earthworks for new Horbach in Prague - Chuchle.

More information

2015 Railway track Plasy – Kaznejov

Modifications of the superstructure on the railway Plasy – Kaznejov include carting and bringing in of a new gravel layer.

More information

2015 The second phase of construction works of shopping center Chodov

Currently we are finishing extensive demolition of shopping center Růže  and continues the second phase of earthworks construction for  the new part of shopping center  Chodov.

More information

2015 Residential house Prague

Excavation of the pit for residential house in Holeckova Street, Prague.

More information