References (Page 22)

References (Page 22)
References

2014 Logistic park – hall B12 Bor u Tachova
We provide a complete landscaping works for new hall B12 in industrial zone Bor u Tachova include nets, roads and parkings.

2014 Logistic park Jenec
An earthworks, landscaping works and construction of parkings for new hall in logistic park in Jenec.

2014 Demolition of Waltrovka Works in Prague
Demolition of former Waltrovka in Prague Jinonice. It goes about wrecking and demolition works of factory halls, waste material recycling included.

2014 Transportation of pedestrian bridge from Dublovice to Beroun
Transportation of pedestrian bridge from Dublovice to Beroun.

2014 Rezidence Central Plaza Praha
For new building Residence Central Plaza in Prague we executed a excavation of construction pit include footing bottom preparing.

2014 Logistic park – hall B12 Bor u Tachova
We provide a complete landscaping works for new hall B12 in industrial zone Bor u Tachova include nets, roads and parkings.

2014 Railway reconstruction Pilsen-Tremosna
We finished a railway reconstruction from Tremosna to Pilsen. There was made a demolition works of former bridges and culverts. This construction included earthworks and building works on railway’s basement in lengh 4 km.

2014 Flood pool Cholupice
We begun a construction of huge flood pool in Cholupice. This construction include three new roads, cables replacement and tubes laying.

2014 Installation of new bells on the Cathedral of St. Bartholomew in Pilsen
By using a truck – mounted crane AC 200 we installed in Pilsen 5 new bells (Bartholomew, Marie, Jan, Hroznata, Prokop) up to height 50m on the Cathedral of St. Bartholomew.