2012 Dismantling of the bridges in Pruneřov
Dismantling of the bridges in Prunéřov was performed with using of the lattice crane TC2800.

2012 Installation of transformer station in Modrava
We installed the transformer station in Modrava with using of our crane AC50.

2012 Instalation of technological devices at heating plant in České Budějovice
We realized instalation of technological devices at heating plant in České Budějovice with using of the telescopic crane AC350.

2012 Instalation of technological devices in Prefa, Prague
We installed a technological devices in Prefa Prague with using of our telescopic crane AC500 and high-lift platform Ruthman T-370.

2012 Installation of the concrete beams at school in Heřmanova Huť
We install the concrete beams with using of the crane AC100 at school in Heřmanova Huť.

2012 Placing of the press into the hall in Robčice
We installed the press with using of the crane AC30 into the hall in Robčice.

2012 Placing of the tram routes in Pilsen, Mikulášské square
Body of tram railroad in Pilsen on Mikulášské square was placed with using of the crane AC30

2012 Transportation and installation of sluices valve in Hluboká nad Vltavou
Sluices valve was installed with using of the crane AC350