2010 Assembly of concrete road bridge girders

Using a crane, we assembled the concrete girders for the road bridge in thevillage of Pila

More information

2010 Removal of Gothic bell by crane

Removal of Gothic bell. Using a crane, we removed the Maria Hilf Gothic bell dating back to 1419.

More information

2010 Transport of technologies in Kralupy nad Vltavou

Transport of technologies in Kralupy nad Vltavou. Using a flatbed semi-trailer, we transported the oversized cargo in Kralupy nad Vltavou.

More information

2010 Bridge transport

Transport of oversized cargo on the route Čepí –Karlovy Vary. Using a semi-trailer and crane, we transported the bridge to the historic centre of Karlovy Vary

More information

2010 Transport of nuclear power station parts

Transport of nuclear power station parts on the route Pilsen – Lovosice – Olkiluoto. Using a deep semi-trailer, we transported nuclear power station parts from Škoda JS.

More information

2010 Transport of mill parts

Carriage of mill parts, Uničov – Mělník. Using a special semi-trailer, we transported mill parts from Uničov to Mělník. Length of oversized cargo 18 m, diameter 4.6 m.

More information

2010 Transport of catalysers

Transport of catalysers, Benešov - Stráž pod Ralskem. Using a frame semi-trailer, we transported catalysers from Benešov to Stráž pod Ralskem. Length of oversized cargo 11 m, diameter 5.4 m

More information

2010 Transport of footbridge steel section

Transport of footbridge steel section to Pilsen. Using a special semi-trailer, we transferred the bridge structure from Prague to Pilsen. Width of oversized cargo 5.2m, length 42m.

More information

2010 Transport of bridge structure

Transport of bridge structure. Using a special semi-trailer, we transported the bridge structure from Brno to Planá u Mariánských Lázní. Oversized cargo height 4.5m, length 44m.

More information

2010 Transport of vessel for coal-fired power station

Transport of oversized cargo for a coal-fired power station. Using a deep semi-trailer, we transferred a vessel of diameter 7.52 m and height 4.35 m on the route Benešov – Mělník.

More information