2006 Demolition in Holesovice
Demolition and earthworks were realized in area of former brewery for new buildings in Holesovice.

2006 Supporting constructions through the river in Stenovice
We realized a supporting constructions for a gas pipes laying through the river in Stenovice.

2006 Wind charter in Pavlov
It is a complete realization of earthworks and basement structure for wind charter in Pavlov.

2006 CTP Humpolec – Valeo hall
In industrial zone Humpolec were realize a complete landlevelling for construction of hall Valeo 3.

2006 Earthworks on Dvorak gallery
On a new building of warehouse Gallerie Dvorak were execute a earthworks, excavating of land coffer dam.

2006 CTP in Bor u Tachova
Complete landlevelling for B2 hall of industrial zone in Bor u Tachova were realized include nets and roads.

2006 Highway D3 from Mezno to Chotoviny
A earthworks were realize on sector of D3 highway from Mezno to Chotoviny.

2006 Paladium Praha
We realized a demoliton and earthworks on excavated land coffer dam to depth 21 m under the terrain during construction of Paladium in Praha.

2006 Mysak gallery in Praha
In gallery Mysak we realized an earthworks on excavated land coffer dam in center of town Praha to depth 16 m under the terrain.

2006 Earthworks in Kunice
Execution of complete land levelling, earthworks, excavating and backfilling. Next were execute a backfills reinforced by geo-lattice to high 13 m.