References (Page 5)
References (Page 5)
References
2020 Transport of steel tanks
We transported a steel tank from Benešov using a frame low loader.
2020 Installation of technology
Installation of technology by using mobile crane AC 500.
2020 Pilsen City Ring, Plaská street
Execution of groundworks for the construction of the Pilsen City Ring.
2020 Earthworks for the construction of UniMeC - Phase II. - Pilsen
Earthworks for UniMeC construction - Phase II.
2020 Installation of power poles
We installed electric power poles by using mobile crane AC 100.
2019 Demolition of reinforced concrete hayloft after
Demolition of reinforced concrete hayloft after a fire in AGRO Staňkov
2019 Demolition of Škoda Ostrov nad Ohří area
Demolition of objects in former Škoda area close to Ostrov nad Ohří.
2019 Transport of tamping machine
We transported tamping machine and by using two AC 100 cranes installed the machine on the rails.