References (Page 5)

References (Page 5)

References

2020 Installation of air conditioning

Using an AC 100 crane, we installed the air conditioning at the Borská pole shopping center.

More information

2020 Transport of steel tanks to Holýšov

We transported steel tanks from Benešov using frame low loaders

More information

2020 Transport of steel tanks

We transported a steel tank from Benešov using a frame low loader.

More information

2020 Installation of technology

Installation of technology by using mobile crane  AC 500.

More information

2020 Pilsen City Ring, Plaská street

Execution of groundworks for the construction of the Pilsen City Ring.

More information

2020 Transport of tank

We transported a steel tank from Horní Slavkov

More information

2020 Transport of tank

We transported a steel tank from Horní Slavkov

More information

2020 Earthworks for the construction of UniMeC - Phase II. - Pilsen

Earthworks for UniMeC construction -  Phase II. 

More information

2020 Installation of power poles

We installed electric power poles  by using mobile crane  AC 100.

More information

2019 Demolition of reinforced concrete hayloft after

Demolition of reinforced concrete hayloft after a fire in AGRO Staňkov

More information