References (Page 7)
References (Page 7)
References
2019 Dismantling of bridge parts in Prague
Dismantling of bridge parts by using mobile crane AC 350.
2019 Installation of power line poles
By using mobile crane AC 200 we assembled the power line poles.
2019 Dismantling of the gas tank
By using mobile crane AC 100 we dismantled the gas tank.
2019 Installation and dismantling of the air conditioning unit
By using mobile crane AC 100 we have dismantled and subsequently installed the new air conditioning unit.
2019 Cerhovice
Earthworks, complete earthworks for new hall in Cerhovice including construction of retention pond and new roundabout with connection to local infrastructure. ... More information
2019 Strojírny Cheb area
Ground works in the area of Strojírny Cheb ... More information
2019 Transport and installation of tanks from Benešov to Ostrov nad Ohří
By using mobile cranes AC 350 and AC 100 we transported and installed tanks
2019 Displacement of 102 tons boulder at a distance of 23 meters
Due to the extension of the library we carried out displacement of 102 tons boulder at a distance of 23 meters by using mobile crane AC 500.