2016 Tunnel shield Viktorie Pilsen
The tunnel shield Viktorie ended up it´s first phase of tunnel excavation in the section Dýšina – Pilsen.

2016 Prague heating plant installation of technology
Transport and installation of technology by crane AC 350 at Prague heating plant.

2016 Transport and installation of railway bridge at Pilsen.
Transport of bridge structure segments and following installation by crane AC 500 at Těšínská street Pilsen.

2016 Montage and removal of podium for concert AC/DC
Assembly of big podium for concert AC/DC in Prague Letňany was done by cranes AC 100, AC 80 and AC 50.

2016 Footbridge Antýgl Šumava
Installation of footbridge by crane AC 35 in motor camp Antýgl at Šumava.

2016 Demolition Dýšiná
Demolition of obsolete building in the IPPE complex in Dýšiná.