References(Page 13)
References(Page 13)
References
2017 Installation of tanks in Pilsen at Gambrinus brewery
We installed the tank by using mobile crane AC100, AC35 and Liebherr 1100 – 4.2.
2017 Montage of bridge steel sections on highway D1 next to Měřín.
Montage of bridge steel section by crane AC 350 on highway D1 next to Měřín.
2017 Replacement of power line pylons at Ostrov u Stříbra.
Replacement of power line pylons by crane AC 160 and high-lift platform T370 at Ostrov u Stříbra.
2017 Installation of steel tanks at Klatovy.
We carry out installation of steel tanks by cranes AC 500 and AC 35.
2017 Loading of tank T-34 at the military museum at Prague.
Loading of tank T-34 at military museum at Prague by mobil crane Liebherr 1100-4.2.
2017 Transport of tank T-34 from military museum at Vítkova, Prague to military technical museum Lešany.
We loaded tank T-34 with help of crane Liebherr 1100 - 4.2 on the trailer and transported to the Military Museum of Vítkov Prague
2017 CTP Přeštice
Earthworks including utilities, sewerage and communications are being realized for the new production hall in Přeštice.
2017 Demolition of two bridge overpasses Exit 37 and Exit 41 on the highway D1
We finished complete demolition of Exit 37 and Exit 41 bridge overpasses on the D1 highway as a part of D1 highway modernization, including material recycling and disposal.
2017 Dismantling of railway bridge in Pilsen – main railway station
Today we started with dismantling of railway bridge in Pilsen – main railway station by using AC 500 telescopis crane.
2017 Dismantling of bridge beams on the highway D1 at Rudná u Prahy
With help of AC 500 telescopis crane we dismantled bridge beams on the highway D1 at Rudná u Prahy and afterwards loaded by crane on the trailer and transported to a designated place.