References(Page 11)
References(Page 11)
References
2018 ZF Electronics Klášterec s.r.o
Earthworks for the construction of a new hall ZF Electronics Klášterec s.r.o. We provide excavation of the pit, transport and deposit of material in the total volume of earthworks about 50,000 m3.
2018 Dismantling of the railway bridge in Nejdek
The AC 500 crane was used to dismantle the railway bridge in Nejdek and to install a temporary bridge.
2018 Earthworks for new premises of EvoBus in Holýšov
Earthworks for new premises construction of EvoBus in Holýšov, including the topsoil removal, excavation and deposit of material in the total volume of earthworks about 250 000 m3
2018 Transport of trams 18T type from Plzen Škoda Transportation to Turkey
Transport of trams 18T type from Plzen Škoda Transportation a.s. to Turkey.
2018 Dismantling of second part of the railway bridge in Pilsen – main station
By using telescopic crane AC 350 we dismantled second part of the railway bridge in Pilsen – main station. ... More information
2018 Construction of an office complex in Prague's Plzeňská street, near Anděl
Execution of earthworks , deep construction of a building pit for the construction of an office complex in Prague, on Plzeňská street near Anděl. The volume of earthworks is approx. 30,000 m3, including backfilling, shaping of the surrounding terrain towards the tunnel, including the realisation of concrete blinding layer.
2018 Installation of tank at Horažďovice
Installation of tank by using mobile crane AC 100. ... More information
2018 Transportation of tank from Benešov to Horaždovice
Transportation of tank from Benešov to Horaždovice.
2017 Installation of 10 beer tanks in Pilsner Urquell Brewery
Installation of 10 beer tanks in Pilsner Urquell Brewery in diameter 6,5m and weight 23,5t by using AC 500 and AC 200 cranes. ... More information