References(Page 16)

References(Page 16)

References

2016 Tunnel shield Viktorie Pilsen

The tunnel shield Viktorie ended up it´s first phase of tunnel excavation in the section Dýšina – Pilsen.

More information

2016 Transportation crusher

Transportation crusher.

More information

2016 Prague heating plant installation of technology

Transport and installation of technology by crane AC 350 at Prague heating plant.

More information

2016 Transportation of excavators

Transportation of excavators.

More information

2016 Transportation of concrete beams

Transportation of concrete beams.

More information

2016 We prepared excavator

We prepared excavator.

More information

2016 Transport and installation of railway bridge at Pilsen.

Transport of bridge structure segments and following installation by crane AC 500 at Těšínská street Pilsen.

More information

2016 Montage and removal of podium for concert AC/DC

Assembly of big podium for concert AC/DC in Prague Letňany was done by cranes AC 100, AC 80 and AC 50.

More information

2016 Footbridge Antýgl Šumava

Installation of footbridge by crane AC 35 in motor camp Antýgl at Šumava.

More information

2016 Demolition Dýšiná

Demolition of  obsolete building in the IPPE complex in Dýšiná.

More information