2016 Logistic park Přehýšov

We realize an earthworks for building of new logistic park named Mountpark close D5 highway, exit 100 Přehýšov.

More information

2015 Cutting of the rock material Horažďovice

Earthwork for reconstruction of railway Horažďovice suburb. We provided cutting of the rock material by using milling cutter in the railway corridor at length 150m by using a special rock milling cutter.  

More information

2015 Installation of bridge deck at Karlovy Vary, Dalovice

We did installation of bridge dec kat Karlovy Vary, Dalovice with use of crane AC 350.

More information

2015 Loading bridge superstructure on train

By use of crane AC 100 and AC 80 we moved bridge superstructure on the train.

More information

2015 Installation of steel bridge during reconstruction of railway line Pilsen – Plasy

We did installation of steel bridge with use of crane AC 200 during reconstruction of railway line Pilsen – Plasy.

More information

2015 Installation of railway sections during reconstruction of railway line Pilsen – Plasy.

We performed assembly of railway sections with use of crane AC 200 during reconstruction of railway line Pilsen – Plasy.

More information

2015 Disassembly of steel silos at Domažlice

We implemented disassembly of steel silos at Domažlice by use of crane DEMAG AC 100 and DEMAG AC 35.

More information

2015 Installation of concrete beam at Bezděkov

Transport and following installation of concrete beams was done by crane AC 100 during bridge repair at Bezděkov.

More information

2015 Assembly of tower crane at Prague´s Pankrác

We made an assembly of tower crane by use of crane AC 350 at Prague´s Pankrác.

More information

2015 Assembly of technology at Škoda Pilsen.

Assembly of technology by crane AC 100 and AC 50 at Pilsen areal Škoda.