References(Page 36)
References(Page 36)
References
2009 Transport of new tram
With use of special trailer Goldhofer STZ L6, we transported new type of tram on route Plzeň - Praha.
2009 Transport of boiler to Chomutov
With use of special trailer, we transported part of boiler on route Praha - Chomutov.
2009 Transport of water turbine Praha - Trója
Transport of water turbine for new hydroelectric plant at Prague, Trója, was performed
by help of special truck.
2009 Air conditioning unit installation
Assembly of air conditioning unit was performed with using of the telescopic crane with capacity to 500 tons.
2009 Assembly of technologies in Kralupy nad Vltavou
Using telescopic cranes, we assembled technologies in Kralupy nad Vltavou.
2009 Assembly of technologies in Klatovy
Using a truss crane of up to 600t and a telescopic crane of up to 160t, we assembled technologies in Klatovy.
2009 Transport of wind turbines
Transport and construction of wind turbines. Using our technology, we prepared and erected wind turbines in Horní Částkov.
2009 Transport of steel vessels
Transport of steel vessels of diameter 5.8 m and length 9 m. Using frame semi-trailers, we transported the steel vessels on the route Mlékosrby – Stráž pod Ralskem.
2009 Demolition work in Pilsen heating plant
We implemented the demolition of parts of the building using a crane in the Pilsen heating plant.
2009 Demolition of bridge in Plasy
We undertook the demolition of a bridge in difficult conditions in the town of Plasy.