References(Page 36)

References(Page 36)

References

2009 Transport of new tram

With use of special trailer Goldhofer STZ L6, we transported new type of tram on route Plzeň - Praha.

More information

2009 Transport of boiler to Chomutov

With use of special trailer, we transported part of boiler on route Praha - Chomutov.

More information

2009 Transport of water turbine Praha - Trója

Transport of water turbine for new hydroelectric plant at Prague, Trója, was performed

by help of special truck.

More information

2009 Air conditioning unit installation

Assembly of air conditioning unit was performed with using of the telescopic crane with capacity to 500 tons.

More information

2009 Assembly of technologies in Kralupy nad Vltavou

Using telescopic cranes, we assembled technologies in Kralupy nad Vltavou.

More information

2009 Assembly of technologies in Klatovy

Using a truss crane of up to 600t and a telescopic crane of up to 160t, we assembled technologies in Klatovy.

More information

2009 Transport of wind turbines

Transport and construction of wind turbines. Using our technology, we prepared and erected wind turbines in Horní Částkov.

More information

2009 Transport of steel vessels

Transport of steel vessels of diameter 5.8 m and length 9 m. Using frame semi-trailers, we transported the steel vessels on the route Mlékosrby – Stráž pod Ralskem.

More information

2009 Demolition work in Pilsen heating plant

We implemented the demolition of parts of the building using a crane in the Pilsen heating plant.

More information

2009 Demolition of bridge in Plasy

We undertook the demolition of a bridge in difficult conditions in the town of Plasy.

More information