References(Page 38)

References(Page 38)
References

2009 Transport of wind turbines
Transport and construction of wind turbines. Using our technology, we prepared and erected wind turbines in Horní Částkov.

2009 Transport of steel vessels
Transport of steel vessels of diameter 5.8 m and length 9 m. Using frame semi-trailers, we transported the steel vessels on the route Mlékosrby – Stráž pod Ralskem.

2009 Demolition work in Pilsen heating plant
We implemented the demolition of parts of the building using a crane in the Pilsen heating plant.

2009 Demolition of bridge in Plasy
We undertook the demolition of a bridge in difficult conditions in the town of Plasy.

2009 Demolition of Tesco Liberec shopping centre
We implemented the complete demolition of the Tesco shopping centre in the centre of Liberec.

2009 Blanka tunnel, Prague
We undertook earthworks in an enclosed tunnel body in the construction of the Blanka tunnel in Prague.

2009 Foundation for welded rotors
We undertook demolition of old foundations and subsequent earthworks and the construction of new foundations for welded rotors inside a factory in Pilsen.

2009 Circle apartment block – 1st phase
We dug deep lagged foundation trenches in the centre of Pilsen for the construction of the Circle apartment block.

2009 Wind farm – Mlýnský vrch 1
We undertook earthworks and ground preparation for the construction of 4 wind turbines including their foundations in the village of Krásná u Aše.

2008 Bridge demolition in Podebrady
Demoliton of the bridge through Labe river in Podebrady with using of crane technique.