References(Page 39)

References(Page 39)

References

2008 Assembly of tower crane – APB Plzeň

With use of telescopic crane AC 50 we assembled tower crane for construction of new section of building at areál APB-Plzeň.

More information

2008 Installation of ceiling panels at Dobřany

Concrete ceiling panels was placed with use of telescopic crane AC 100 on top of the building at Dobřany.

More information

2008 Placement of technology of residental building at Chodov

By telescopic crane AC 100 we realized placeing of technology on top of residenta building at Chodov.

More information

2008 Assembly of column at Vřesová by crane AC 350

With help of crane AC 350 we performed assembly of column at Vřesová.

More information

2008 Transport of railway bridge Sokolov

Transport of oversize load, new railway bridge, we performed with use of special trailer on route Ostrava - Sokolov.

More information

2008 Transport of concrete beams

By use of platform trailer and special trailer we transported concrete beams on route Prague – Sušice by size 30 x 0,5 x 1m.

More information

2008 Transport of air technology

With use of lowboy trailer, we transported part o fair technology on route Valašské Meziříčí - Mělník

More information

2008 Transport of rock cutter

With use of special trailer, we transported new rock cutter on route Plzeň - Votice.

More information

2008 Transport of beams Chomutov

With use of low deck trailer and specila trailer we transported concrete beams of size 30 x 2,5 x 1m on route Litice nad Orlicí – Chomutov.

More information

2008 Transport of bridge to Jenišov

With use of platform trailer, we transported concrete parts of bridge on route Praha - Jenišov.

More information