2019 Demolition of Strojírny Cheb area
Demolition of buildings in the former premises of Strojírny Cheb, incl. earthworks and construction of monolithic retaining walls. ... More information
2019 Transport of beer tanks
Transport of 10 beer tanks from Bürgstadt, Germany to Pilsen brewery. Beer tank with a diameter of 6.5 m and a length of 23 m, weight 28.7 t. ... More information
2019 Assembly of tower crane
By using mobile crane AC 200 we carried out assembly of tower crane on the pond shore.
2019 Assembly of tower crane
By using mobile crane AC 200 we carried out assembly of tower crane on the pond shore.
2019 Technology installation in the hall in Bor u Tachova
Technology installation in the hall in Bor u Tachova by using two mobile cranes AC 100 and LTM 1070
2019 Transportation and installation of technology
Transportation of technology to the Technical Inspection Station and consequential installation by using mobile crane AC 50.
2019 New hall at Bor u Tachova
Complete realisation of groundworks for extention of B6 hall and realisation of paved areas for cars and trucks including utilities in logistic park CTP Bor u Tachova.