References(Page 10)

References(Page 10)
References

2019 Assembly of tower crane
By using mobile crane AC 200 we carried out assembly of tower crane on the pond shore.

2019 Technology installation in the hall in Bor u Tachova
Technology installation in the hall in Bor u Tachova by using two mobile cranes AC 100 and LTM 1070

2019 Transportation and installation of technology
Transportation of technology to the Technical Inspection Station and consequential installation by using mobile crane AC 50.

2019 New hall at Bor u Tachova
Complete realisation of groundworks for extention of B6 hall and realisation of paved areas for cars and trucks including utilities in logistic park CTP Bor u Tachova.

2018 Demolition of block of flats at Bečov
Demolition of block of flats including material recyclation at Bečov.

2018 Transport of 4 boilers
We have transported four boilers with a weight of 109 tons to ČEZ - Trmice heating plant.

2018 D1 - The new hall
Complete earthworks for construction of a new hall in the logistics park D1 - Ostředek

2018 Steel beams - parts of the bridge Dublovice and Nový Knín - Pilsen
Transportation of steel beams - parts of the bridge from Dublovice and Nový Knín to Pilsenn and consequential installation by using AC 500.

2018 Transportation of tower crane in Pilsen
Transportation of tower crane in Pilsen. ... More information

2018 Transportation of two castings to ŠKODA JS Works
Transportation of two castings to ŠKODA JS Works.