References(Page 10)

References(Page 10)

References

2019 Assembly of tower crane

By using mobile crane AC 200 we carried out assembly of tower crane on the pond shore.

More information

2019 Technology installation in the hall in Bor u Tachova

Technology installation in the hall in Bor u Tachova by using two mobile cranes AC 100 and LTM 1070

More information

2019 Transportation and installation of technology

Transportation of technology to the Technical Inspection Station and consequential  installation by using mobile crane AC 50.

More information

2019 New hall at Bor u Tachova

Complete realisation of groundworks for extention  of B6 hall and realisation of paved areas for cars and trucks including utilities in logistic park CTP Bor u Tachova. 

More information

2018 Demolition of block of flats at Bečov

Demolition  of block of flats including material recyclation at Bečov.

More information

2018 Transport of 4 boilers

We have transported four boilers with a weight of 109 tons to ČEZ - Trmice heating plant.

More information

2018 D1 - The new hall

Complete earthworks for construction of a new hall in the logistics park D1 - Ostředek

More information

2018 Steel beams - parts of the bridge Dublovice and Nový Knín - Pilsen

Transportation of steel beams - parts of the bridge from Dublovice and Nový Knín to Pilsenn and consequential installation by using AC 500.

More information

2018 Transportation of tower crane in Pilsen

Transportation of tower crane in Pilsen. ... More information

2018 Transportation of two castings to ŠKODA JS Works

Transportation of two castings to ŠKODA JS Works.

More information