References(Page 8)

References(Page 8)

References

2019 Transport of concrete pits

Transport of concrete pits to Vejprnice.

More information

2019 Displacement of 102 tons boulder at a distance of 23 meters

Due to the extension of the library  we carried out displacement of  102 tons  boulder  at a distance of 23 meters by using mobile crane AC 500.

More information

2019 Transport of excavator

Transport of excavator from Pilsen to Cheb.

More information

2019 Demolition of Strojírny Cheb area

Demolition of buildings in the former premises of Strojírny Cheb, incl. earthworks and construction of monolithic retaining walls. ... More information

2019 Transport of beer tanks

Transport of 10 beer tanks from Bürgstadt, Germany to Pilsen brewery. Beer tank with a diameter of 6.5 m and a length of 23 m, weight 28.7 t. ... More information

2019 Transport of trams

Transport of Škoda 35T trams

More information

2019 Transport of presses

We transported two presses to Hrádek u Rokycan.

More information

2019 Assembly of tower crane

By using mobile crane AC 200 we carried out assembly of tower crane on the pond shore.

More information

2019 Assembly of tower crane

By using mobile crane AC 200 we carried out assembly of tower crane on the pond shore.

More information

2019 Technology installation in the hall in Bor u Tachova

Technology installation in the hall in Bor u Tachova by using two mobile cranes AC 100 and LTM 1070

More information