References(Page 23)
References(Page 23)
References
2014 Transport of tunnel shield pieces to Dysina
Transport of tunnel shield pieces to Dysina.
2014 Transport of subway train
We transported skeleton of subway train by frame trailer Goldhofer EURO 64 -04.
2014 Transport and unloading of sewer tank in Pilsen.
Transport and following uloading of two sewer tanks by using mobile crane AC 100 in Pilsen.
2014 Transport of transmitter structure at Pilsen.
Transport of transmitter structure at Sylván in Pilsen.
2014 Crane works at Nuclear power plant Dukovany
From Kutná Hora to the Nuclear power plant Dukovany we transported container with backup power total weight 129 tons. Installation of backup power we realized by using two truck-mounted cranes AC 200.
2014 Installation of steel tanks at Česká Lípa.
Montage of steel tanks of diameter 4,9m, lenght 21m and weight of 40 tuns telescopic crane AC 350.
2014 Crane work at nuclear power station Temelín.
Transport of oversize load of total weight 129t from Kutná Hora to nuclear power station Temelín and following installation of new backup source by using two cranes AC 200.
2014 Earthworks for new part U Cenku
We execute an earthworks, cycle track, in-line track include bulwark for sledging and walkway for new park U Cenku about area 170 hectare in Cerny most in Prague.
2014 Assembly of transmitter structure at Pilsen.
Assembly of transmitter structure at Pilsen by telescopic crane AC 100.