References(Page 26)
References(Page 26)
References
2013 Skoda ETD Pilsen tower block demolition
We realized a complete demolition in Skoda ETD Pilsen. It is a 6 floor tower block include recycling and materiál disposal.
2013 Tower block demolition in Chanov
We made a complete demolition works of 8 floors tower block include recycling and material disposal in Chanov.
2013 Earthworks for apartment block Jubileum House
We realized an earthworks and demolition works for new administrative building Jubileum House in Prague.
2013 Tabor-Sudomerice railway modernisation
Earthworks for extension of railway Tabor – Sudomerice.
2013 Installation of transformer station in Pstruží
By help of crane AC 100 was performed installation of transformer station in city of Pstruží and then followed up we installed in tough conditions another transformer station on the mountain Plešivec 1028 metersabove sea level.
2013 Installation of a giant billboard Bauhaus Pilsen
Installation of giant billboard for Pilsen Bauhaus was implemented by help of telescopic crane AC 100.
2013 Disassembly of steel pylons in Jarov
By telescopic crane AC 50 was performed disassemlby and following assembly of steel pylons.
2013 Assemly of steel column in Kárany
We implemented assembly of steel column for bridge in Kárany by telescopic crane AC 350.
2013 Loading of gearbox in Hronov
The loading of gearbox in Hronov was done by telescopic crane AC 80.
2013 Construction of a new hall in Škoda Transportation
By telescopic cranes we assemble new hall in Škoda Transportation a.s.