References(Page 27)
References(Page 27)
References
2013 Disassembly of Tunnel shield in Pilsen
Telescopic crane AC 50 was used to disassemble Tunnel shield at the construction site of new Uslavas´sewage collector in Pilsen.
2013 Transit through hub Plzeň
We are executing an earthwork in Prokopova street and earthworks for the new subway in Šumavská street in Pilsen.
2013 Transit through hub Plzeň
We are executing an earthwork in Prokopova street and earthworks for the new subway in Šumavská street in Pilsen.
2013 Recultivation work on trees at the castle in Lány
With help of truck mounted platform Ruthmann T370 we performed recultivation works on trees around the castle in Lány.
2013 Disassembly of galvanizing tub at Čenkov
Disassembly of galvanizing tub weighing 40t at Čenkov was implemented by two telescopic cranes AC 100.
2013 Disassembly of tunnel shield from subway construction site.
We performed lifting of tunneling shield parts from subway construction site weighing 35t with use of crane AC 500.
2013 Demolition of hall Celestica Lego in Kladno
Now we are realizing of complete demoliton of production hall Celestica in Lego area in Kladno. It is complete demoliton of these building include floor, energoblock, fire tank and utilities.
2013 we transported a mill‘s casing about weight 144 tons to the Lovosice harbor
We transported a mill’s casing about weight 144 tons from Přerov to Lovosice. Oversized cargo of diameter 8,8 m were transported on special leader STZ THP 16 (no. of axis: 16).
2012 Mills casing transportation
We transported a mills casing about dimension 8,48 mand weight 119 tons to the Mělník harbor.
2012 Transportation of the bus to London
Transportation of the bus by designer David Černý to London, venue of 15th Olympics. With using of the frame loader we transported unique double-decker bus from work-room of Prague designer before the Czech House in London.