References(Page 13)

References(Page 13)

References

2017 Installation of the hall in Štěnovice.

By using mobile crane AC100 and AC35 and Liebherr  1100 -4.2 we realized installation of the hall in Štěnovice.

More information

2017 Installation of tanks in Pilsen at Gambrinus brewery

We installed the tank by using mobile crane AC100, AC35 and Liebherr 1100 – 4.2.

More information

2017 Montage of bridge steel sections on highway D1 next to Měřín.

Montage of bridge steel section by crane AC 350 on highway D1 next to Měřín.

More information

2017 Replacement of power line pylons at Ostrov u Stříbra.

Replacement of power line pylons by crane AC 160 and high-lift platform T370 at Ostrov u Stříbra.

More information

2017 Installation of steel tanks at Klatovy.

We carry out installation of steel tanks by cranes AC 500 and AC 35.

More information

2017 Loading of tank T-34 at the military museum at Prague.

Loading of tank T-34 at military museum at Prague by mobil crane Liebherr 1100-4.2.

More information

2017 Transport of tank T-34 from military museum at Vítkova, Prague to military technical museum Lešany.

We loaded tank T-34 with help of crane Liebherr 1100 - 4.2 on the trailer and transported to the Military Museum of Vítkov Prague

More information

2017 CTP Přeštice

Earthworks  including utilities, sewerage and communications   are being realized for the new production hall in Přeštice.

More information

2017 Demolition of two bridge overpasses Exit 37 and Exit 41 on the highway D1

We finished complete demolition of Exit 37 and Exit 41 bridge  overpasses on the D1 highway as a part of D1 highway modernization, including  material recycling and disposal.

More information